All aspects of construction have progressed as the building is large and in various stages of construction from one end to the other. Exterior curtain wall, storefront windows, and doors are being installed, and the building will be completely enclosed in the coming weeks. Nearly all of the walls are framed throughout and a good portion of the lower level walls have sheetrock. Interior storefront windows also are being installed. The chilled water pipes will be flushed soon and conditioned air will be turned on in the northern portion of the building in the coming weeks so that building finishes may begin.