March 2019 | Rio Grande Campus Renovations

At Rio Grande Campus, crews have completed pouring walls at the north basement mechanical room and are working on electrical and telecom systems. Metal wall framing also has gone up on the second and third … Continue reading

February 2019 | Rio Grande Campus Renovations

Construction crews continue work on the lower level, including mechanical/electrical/plumbing overhead and chilled beam installation. The mechanical room slab in the north atrium and the underground electrical duct bank have been poured. Interior wall framing … Continue reading

December 2018 | Rio Grande Campus Renovations

Construction crews are finalizing demolition of interior sections, most recently working on structural floor demolition. In addition, crews are installing hydronic piping and a new roof at the chiller house. In January, crews will continue … Continue reading

Rio Grande Campus: Abatement nearing completion

As of November 21, the non-structural demolition and abatement of Bldg. 1000 is 60 percent complete. The third floor and second floor are completely cleaned out. All hazardous materials have been removed from those floors. … Continue reading

ACC celebrates Rio Grande Campus groundbreaking

The Austin Community College District (ACC) breaks ground on renovations at its Rio Grande Campus 9 to 10:30 a.m. Thursday, August 10. The event is free and open to the public. Click here to RSVP … Continue reading

Rio Grande Campus

Rio Grande design work continues; renovation groundbreaking planned

Rio Grande Campus Building 1000 classrooms have closed, and faculty and staff are relocating to other campuses during the summer. The campus remains open to students, offering more than 100 classes in Building 3000. Design … Continue reading

Rio Grande Campus

Rio Grande Campus Building 1000 to close

The main building at the Rio Grande Campus will close mid-May. The campus will remain open to students, offering more than 100 classes in Building 3000. The main building is expected to reopen in fall … Continue reading

Board selects construction manager

ACC’s Board of Trustees selected Bartlett-Cocke as the construction-manager-at-risk for Rio Grande Campus. The firm, one of three finalists considered out of the 11 submitted proposals, oversaw Building 3000 renovations at Rio Grande Campus.

Rio Grande's Building 3000

Board hears CM proposals

Three construction-manager firm finalists — Flintco, Bartlett-Cocke, and SpawGlass — presented proposals to ACC’s Board of Trustees. Selection is expected by February.

Board selects architect/engineering team

ACC’s Board of Trustees selected Studio 8 Architects (HUB) as the lead architect/engineering team for Rio Grande Campus. The firm is one of three finalists considered out of the 12 submitted proposals. Studio 8 Architects … Continue reading