November 2019 | ACC Highland Phase 2

Overhead doors are being installed and the majority of the exterior curtain wall and stucco work are completed. Exterior grading and flatwork have begun. The exterior and interior stair railings are currently being installed. The culinary kitchen equipment will be set on the roof soon. Acoustic panels are in progress in the main corridors. Elevator installation is ongoing and the insulation for the metal wall panels at the paseo are being installed. The waterproofing at the upper-level paseo concrete is underway.