October 2011 – Hays Campus Update

We continue to make steady progress on the project on the ACC Hays Campus. As of the date of this posting, bond documents could be closed by December, at which point the firm construction budget will be finalized.

A Kyle External Review Committee meeting was held September 15 to present the final campus master plan. The local stakeholders gave a very favorable review.

In addition, throughout the month of September, Gensler and Flintco attended a series of 24 data gathering meetings with ACC departments to develop the schematic design plans and elevations for the new phase I building.

Last week, Gensler presented the first draft of floor plans for review and comment to the project team. Several changes were made and a revised package is being prepared in anticipation of an Internal Steering Committee meeting scheduled in late October for all ACC departments to review the plans and elevations and provide comments and feedback.

A second series of meetings will be scheduled in early November for all the ACC departments to review the floor plans for each of their programmed space areas.