January 2013 — Elgin Campus Update

An aerial view of the Elgin Campus taken in December 2012.

Work is progressing on ACC’s Elgin Campus in advance of a planned opening this fall. Here is the latest:

  • Brickwork is being completed. Exterior curtain wall windows, metal wall panels, and insulation are nearly complete.
  • Interior walls are being finished and painted. The ceramic tile floors in the restrooms are complete. Millwork is being installed.
  • Elevators have been installed. The atrium stair installation is well underway.
  • Heating, ventilation, and air-conditioning units are up and running.
  • Interior and exterior light fixtures are being installed.
  • Mechanical, electrical, and plumbing inspections are underway by the design engineers and the architect. The fire sprinkler system is nearly complete.

Outside the facility, a majority of paving is complete and additional grading and paving around the building has begun.  Monument signs at each driveway are being constructed. Several light poles have been erected, and irrigation lines and landscaping are underway.

ACC’s Elgin Campus will be the first community college campus in Bastrop County. Located adjacent to U.S. Highway 290 and County Line Road, the campus will provide convenient access to general education and academic transfer opportunities, workforce education, and foundation skills programs for those not yet college-ready

Keep up-to-date with construction and other campus news on the Elgin Campus webpage.

Back to Top