{"id":672,"date":"2025-02-27T15:44:10","date_gmt":"2025-02-27T21:44:10","guid":{"rendered":"https:\/\/sites.austincc.edu\/2022-bond\/?page_id=672"},"modified":"2026-04-15T15:53:27","modified_gmt":"2026-04-15T20:53:27","slug":"2022-bond-hays-campus","status":"publish","type":"page","link":"https:\/\/sites.austincc.edu\/2022-bond\/2022-bond-hays-campus\/","title":{"rendered":"Hays Campus"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Health Sciences Building<\/h2>\n<h3 class=\"wp-block-heading\">What\u2019s Happening<\/h3>\n<p class=\"wp-block-paragraph\">The 2022 bond will help ACC expand facilities at Hays Campus. Projects include expanding facilities that support the health sciences programs.<\/p>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Project at a Glance<\/h3>\n<p class=\"wp-block-paragraph\">Total Budget | To be determined<br \/>Project Scope | Health Sciences Program expansion<br \/>Architecture &amp; Engineering | HarrisonKornberg Architects, LLC<br \/>Contractor for Hays | Kitchell Contractors<br \/>ACC Project Manager | Jamie Hand<\/p>\n<\/div>\n<\/div>\n<h3 class=\"wp-block-heading\">Timeline<\/h3>\n<p class=\"wp-block-paragraph\">The timeline for the Hays Campus expansion will include adding a new building to the campus site. The anticipated enrollment for the new building is estimated to bring 1,000 students to the campus.<\/p>\n<\/div>\n<\/div>\n<div class=\"list\">\n<p class=\"trigger\"><a href=\"#\">Health Sciences Building<\/a><\/p>\n<div class=\"toggle_container\">\n<div class=\"block\">\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile is-vertically-aligned-center is-image-fill-element\">\n<div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\">Health Sciences Building<\/h2>\n<h4 class=\"wp-block-heading\"><strong>Expected Groundbreaking for Summer 2026<\/strong><\/h4>\n<p class=\"wp-block-paragraph\"><strong>Current Status:<\/strong> In progress, the design phase. The anticipated completion of the programming phase is March 2026.<\/p>\n<\/div>\n<figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2025\/02\/RS23125_20230726-HLC-Nursing-ca-331_lpr-1024x683.jpg\" alt=\"\" class=\"wp-image-675 size-large\" style=\"object-position:50% 50%\" srcset=\"https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2025\/02\/RS23125_20230726-HLC-Nursing-ca-331_lpr-1024x683.jpg 1024w, https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2025\/02\/RS23125_20230726-HLC-Nursing-ca-331_lpr-300x200.jpg 300w, https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2025\/02\/RS23125_20230726-HLC-Nursing-ca-331_lpr-768x512.jpg 768w, https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2025\/02\/RS23125_20230726-HLC-Nursing-ca-331_lpr-1536x1025.jpg 1536w, https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2025\/02\/RS23125_20230726-HLC-Nursing-ca-331_lpr-150x100.jpg 150w, https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2025\/02\/RS23125_20230726-HLC-Nursing-ca-331_lpr.jpg 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"wp-block-heading\">What to Expect<\/h2>\n<ul class=\"wp-block-list\">\n<li>When completed, the new 5000 building will provide a new home for our Health Sciences program in the South Region. ACC\u2019s nursing program will anchor the building and include other health sciences programs.&nbsp;<\/li>\n<li>Beyond the building, there will be additional site improvements, such as a driveway, parking lot, and site landscaping. The building will aim to receive LEED Silver certification.<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<h3 class=\"wp-block-heading\">Latest Updates for 2022 Bond: Hays Campus<\/h3>\n<ul class=\"wp-block-latest-posts__list wp-block-latest-posts\">\n<li>\n<div class=\"wp-block-latest-posts__featured-image alignleft\"><img decoding=\"async\" src=\"https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2026\/05\/RS13107_20200409-HYS-Altered-Landscapes-ca-063_lpr-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail wp-post-image\" alt=\"A modern educational building with a combination of brick and stone architecture. The structure features large windows and a prominent clock tower. In the foreground, there is a paved area with a stop sign and landscaped greenery, including small trees and grass. The sky is clear with a few clouds.\" style=\"max-width:150px;max-height:150px;\" srcset=\"https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2026\/05\/RS13107_20200409-HYS-Altered-Landscapes-ca-063_lpr-150x150.jpg 150w, https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2026\/05\/RS13107_20200409-HYS-Altered-Landscapes-ca-063_lpr-250x250.jpg 250w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/div>\n<p><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/sites.austincc.edu\/2022-bond\/hays-campus-expansion-advances-to-final-design-phase\/\">Hays Campus Expansion Advances to Final Design Phase<\/a><\/p>\n<div class=\"wp-block-latest-posts__post-excerpt\">Austin Community College District (ACC) continues to move forward on the Hays Campus expansion. The College reached a key milestone with the completion of the Design Development phase for the 2022 Bond project at Hays. &hellip; <a href=\"https:\/\/sites.austincc.edu\/2022-bond\/hays-campus-expansion-advances-to-final-design-phase\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/div>\n<\/li>\n<li>\n<div class=\"wp-block-latest-posts__featured-image alignleft\"><img decoding=\"async\" src=\"https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2026\/01\/RS28151_20250312-HYS-Student-Life-ji-135_scr-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail wp-post-image\" alt=\"\" style=\"max-width:150px;max-height:150px;\" srcset=\"https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2026\/01\/RS28151_20250312-HYS-Student-Life-ji-135_scr-150x150.jpg 150w, https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2026\/01\/RS28151_20250312-HYS-Student-Life-ji-135_scr-250x250.jpg 250w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/div>\n<p><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/sites.austincc.edu\/2022-bond\/hays-campus-expansion-reaches-50-design-milestone\/\">Hays Campus Expansion Reaches 50% Design Milestone<\/a><\/p>\n<div class=\"wp-block-latest-posts__post-excerpt\">Austin Community College District (ACC) has reached a major milestone in the Hays Campus expansion, with the Hays 5000 Phase 3 project now officially halfway through the Design Development stage. The project includes Building 5000 &hellip; <a href=\"https:\/\/sites.austincc.edu\/2022-bond\/hays-campus-expansion-reaches-50-design-milestone\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/div>\n<\/li>\n<li>\n<div class=\"wp-block-latest-posts__featured-image alignleft\"><img decoding=\"async\" src=\"https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2025\/10\/RS13105_20200409-HYS-Altered-Landscapes-ca-057_scr-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail wp-post-image\" alt=\"Hays Campus exterior\" style=\"max-width:150px;max-height:150px;\" srcset=\"https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2025\/10\/RS13105_20200409-HYS-Altered-Landscapes-ca-057_scr-150x150.jpg 150w, https:\/\/sites.austincc.edu\/2022-bond\/wp-content\/uploads\/sites\/234\/2025\/10\/RS13105_20200409-HYS-Altered-Landscapes-ca-057_scr-250x250.jpg 250w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/div>\n<p><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/sites.austincc.edu\/2022-bond\/hays-campus-expansion-moves-forward-as-design-work-advances\/\">Hays Campus Expansion Moves Forward as Design Work Advances<\/a><\/p>\n<div class=\"wp-block-latest-posts__post-excerpt\">Austin Community College District (ACC) approaches a major milestone in the Hays Campus expansion. The schematic design phase for the new academic building is scheduled for completion by early November, marking an important step forward &hellip; <a href=\"https:\/\/sites.austincc.edu\/2022-bond\/hays-campus-expansion-moves-forward-as-design-work-advances\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/div>\n<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">\n","protected":false},"excerpt":{"rendered":"<p>Health Sciences Building What\u2019s Happening The 2022 bond will help ACC expand facilities at Hays Campus. Projects include expanding facilities that support the health sciences programs. Project at a Glance Total Budget | To be &hellip; <a href=\"https:\/\/sites.austincc.edu\/2022-bond\/2022-bond-hays-campus\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":4223,"featured_media":678,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-672","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/2022-bond\/wp-json\/wp\/v2\/pages\/672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/2022-bond\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sites.austincc.edu\/2022-bond\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/2022-bond\/wp-json\/wp\/v2\/users\/4223"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/2022-bond\/wp-json\/wp\/v2\/comments?post=672"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/2022-bond\/wp-json\/wp\/v2\/pages\/672\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/2022-bond\/wp-json\/wp\/v2\/media\/678"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/2022-bond\/wp-json\/wp\/v2\/media?parent=672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}