Building 8000 will consist of a 200 computer ACCelerator lab, classrooms, and office space. This project also includes a new parking lot on the west side of campus. The parking lot has achieved substantial completion and is open to the public. Landscaping replacement is complete. Masonry repairs are ongoing. Building 8000 has power and the ACCelerator ceiling has been painted. Interior tape, float and paint is ongoing.
Tags: Building 8000, parking
Back to Top