{"id":1227,"date":"2016-01-22T20:04:34","date_gmt":"2016-01-22T20:04:34","guid":{"rendered":"https:\/\/sites.austincc.edu\/bond\/?p=1227"},"modified":"2016-01-22T20:04:34","modified_gmt":"2016-01-22T20:04:34","slug":"round-rock-campus-additions-proposed-in-two-phases","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/bond\/round-rock-campus-additions-proposed-in-two-phases\/","title":{"rendered":"Round Rock Campus additions proposed in two phases"},"content":{"rendered":"<p>ACC\u2019s Office of Facilities &amp; Construction is proposing that Round Rock Campus development occur in two phases starting with construction of a new 45,286-square-foot building followed by renovation of existing facilities. The proposal was presented at a campus steering committee meeting Thursday, January 21.<\/p>\n<p>The new building is scheduled to open in summer 2018, with phase II renovations to be completed by fall 2018. When both phases are complete, the campus will feature:<\/p>\n<ul>\n<li>A 12,085-square-foot ACCelerator\/Learning Lab with 200 specially-equipped computer stations.<\/li>\n<li>Increased capacity from 5,000 to 6,000 students.<\/li>\n<li>13 additional classrooms.<\/li>\n<li>25 additional faculty offices.<\/li>\n<li>Expanded and improved student services areas.<\/li>\n<li>Additional nursing simulation space and sonography patient bays.<\/li>\n<\/ul>\n<p>The plan is pending review by the ACC president\/CEO and executive vice president\/provost, with construction set to begin March 2017.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ACC\u2019s Office of Facilities &amp; Construction is proposing that Round Rock Campus development occur in two phases starting with construction of a new 45,286-square-foot building followed by renovation of existing facilities. The proposal was presented &hellip; <a href=\"https:\/\/sites.austincc.edu\/bond\/round-rock-campus-additions-proposed-in-two-phases\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3932,"featured_media":544,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[11],"tags":[14,41],"class_list":["post-1227","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-round-rock-campus","tag-bond","tag-round-rock"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/users\/3932"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/comments?post=1227"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1227\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media\/544"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media?parent=1227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/categories?post=1227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/tags?post=1227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}