{"id":1418,"date":"2016-11-17T20:02:15","date_gmt":"2016-11-17T20:02:15","guid":{"rendered":"https:\/\/sites.austincc.edu\/bond\/?p=1418"},"modified":"2016-11-17T20:03:41","modified_gmt":"2016-11-17T20:03:41","slug":"round-rock-campus-parking-lot-construction-begins-soon","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/bond\/round-rock-campus-parking-lot-construction-begins-soon\/","title":{"rendered":"Round Rock Campus parking lot construction begins soon"},"content":{"rendered":"<p><a href=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2016\/11\/Round-Rock-Phase-II-diagram-768x780.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-1419\" src=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2016\/11\/Round-Rock-Phase-II-diagram-768x780-295x300.jpg\" alt=\"Round Rock phase two map\" width=\"295\" height=\"300\" srcset=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2016\/11\/Round-Rock-Phase-II-diagram-768x780-295x300.jpg 295w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2016\/11\/Round-Rock-Phase-II-diagram-768x780.jpg 768w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2016\/11\/Round-Rock-Phase-II-diagram-768x780-148x150.jpg 148w\" sizes=\"auto, (max-width: 295px) 100vw, 295px\" \/><\/a>Austin Community College in early December begins work on a new parking lot at the Round Rock Campus.<\/p>\n<p>The 300-vehicle lot will be on the north side of the campus (north of current parking lot K) and will ease parking congestion during the construction of a new classroom building west of Building 2000.<\/p>\n<p>The new lot is scheduled to open in March, when a smaller lot will close temporarily to make room for construction. The work is one of several ongoing districtwide renovation and expansion projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Austin Community College in early December begins work on a new parking lot at the Round Rock Campus. The 300-vehicle lot will be on the north side of the campus (north of current parking lot &hellip; <a href=\"https:\/\/sites.austincc.edu\/bond\/round-rock-campus-parking-lot-construction-begins-soon\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3932,"featured_media":1419,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[11],"tags":[21],"class_list":["post-1418","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-round-rock-campus","tag-round-rock-campus"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1418","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/users\/3932"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/comments?post=1418"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1418\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media\/1419"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media?parent=1418"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/categories?post=1418"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/tags?post=1418"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}