{"id":1590,"date":"2017-06-14T15:05:48","date_gmt":"2017-06-14T15:05:48","guid":{"rendered":"https:\/\/sites.austincc.edu\/bond\/?p=1590"},"modified":"2017-06-14T15:05:48","modified_gmt":"2017-06-14T15:05:48","slug":"topping-out-celebrated-as-framework-is-completed","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/bond\/topping-out-celebrated-as-framework-is-completed\/","title":{"rendered":"Topping-out celebrated as framework is completed"},"content":{"rendered":"<p><a href=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2017\/06\/crewsdoingriverbat-sign-06_17.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-1593 size-medium\" src=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2017\/06\/crewsdoingriverbat-sign-06_17-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2017\/06\/crewsdoingriverbat-sign-06_17-300x200.jpg 300w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2017\/06\/crewsdoingriverbat-sign-06_17-150x100.jpg 150w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2017\/06\/crewsdoingriverbat-sign-06_17.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>Construction crews, architects, and engineers joined college and community leaders for a topping-out celebration June 7 at the campus site. See photos from the event and a brief video about the project at <a href=\"https:\/\/sites.austincc.edu\/newsroom\/acc-san-gabriel-campus-marks-construction-milestone\/\">ACC San Gabriel Campus marks construction milestone<\/a>.<\/p>\n<p>Foundations have been poured. Crews are installing exterior framing and the middle structure is being set. Above-ceiling work (fire sprinkler pipe, duct work, plumbing lines, and electrical conduit\/boxes) continues in the building\u2019s east wing. The concrete masonry core of the west-wing stair\/elevator tower is complete.<\/p>\n<p>Proposals for campus streets not previously named will be submitted to the City of Leander.<\/p>\n<p>A live webcam on the <a href=\"https:\/\/sites.austincc.edu\/bond\/leander-campus-updates\/\">ACC Bond Projects: San Gabriel Campus<\/a> webpage shows the campus taking shape in real time.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction crews, architects, and engineers joined college and community leaders for a topping-out celebration June 7 at the campus site. See photos from the event and a brief video about the project at ACC San &hellip; <a href=\"https:\/\/sites.austincc.edu\/bond\/topping-out-celebrated-as-framework-is-completed\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3932,"featured_media":1592,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9],"tags":[14,47],"class_list":["post-1590","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-leander-campus","tag-bond","tag-san-gabriel-campus"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1590","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/users\/3932"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/comments?post=1590"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1590\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media\/1592"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media?parent=1590"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/categories?post=1590"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/tags?post=1590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}