{"id":1739,"date":"2017-12-13T18:08:33","date_gmt":"2017-12-13T18:08:33","guid":{"rendered":"https:\/\/sites.austincc.edu\/bond\/?p=1739"},"modified":"2018-04-04T19:11:15","modified_gmt":"2018-04-04T19:11:15","slug":"on-track-to-open-in-spring","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/bond\/on-track-to-open-in-spring\/","title":{"rendered":"Elgin Campus: On Track to Open in Spring"},"content":{"rendered":"<p><a href=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/02\/EGN-Phase-2-Construction-Progress-scr-e1519668488379.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-1740\" src=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/02\/EGN-Phase-2-Construction-Progress-scr-e1519668488379.jpg\" alt=\"\" width=\"1350\" height=\"573\" srcset=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/02\/EGN-Phase-2-Construction-Progress-scr-e1519668488379.jpg 1350w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/02\/EGN-Phase-2-Construction-Progress-scr-e1519668488379-300x127.jpg 300w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/02\/EGN-Phase-2-Construction-Progress-scr-e1519668488379-768x326.jpg 768w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/02\/EGN-Phase-2-Construction-Progress-scr-e1519668488379-1024x435.jpg 1024w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/02\/EGN-Phase-2-Construction-Progress-scr-e1519668488379-150x64.jpg 150w\" sizes=\"auto, (max-width: 1350px) 100vw, 1350px\" \/><\/a>Phase 2 is on track to open for spring semester. Construction is wrapping up and is expected to be complete by the end of this month. Furniture is planned to be installed before winter break. Faculty will move in after the break to complete equipment set-up and training. <strong><a href=\"https:\/\/sites.austincc.edu\/newsroom\/bond-projects-update-elgin-hays-round-rock-rio-grande-and-san-gabriel\/\">Read more about this and other capital improvement projects &gt;\u00a0<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Phase 2 is on track to open for spring semester. Construction is wrapping up and is expected to be complete by the end of this month. Furniture is planned to be installed before winter break. &hellip; <a href=\"https:\/\/sites.austincc.edu\/bond\/on-track-to-open-in-spring\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3556,"featured_media":1740,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6],"tags":[31,70,71],"class_list":["post-1739","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-elgin-campus","tag-elgin-campus","tag-phase-2","tag-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/users\/3556"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/comments?post=1739"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1739\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media\/1740"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media?parent=1739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/categories?post=1739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/tags?post=1739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}