{"id":1841,"date":"2018-04-16T17:06:59","date_gmt":"2018-04-16T17:06:59","guid":{"rendered":"https:\/\/sites.austincc.edu\/bond\/?p=1841"},"modified":"2018-04-16T17:06:59","modified_gmt":"2018-04-16T17:06:59","slug":"san-gabriel-campus-campus-installation-continues","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/bond\/san-gabriel-campus-campus-installation-continues\/","title":{"rendered":"San Gabriel Campus | Campus Installation Continues"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-1847 size-full\" src=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/04\/SGC-Pic-6-April18-e1523898344902.jpg\" alt=\"\" width=\"4032\" height=\"1743\" srcset=\"https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/04\/SGC-Pic-6-April18-e1523898344902.jpg 4032w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/04\/SGC-Pic-6-April18-e1523898344902-300x130.jpg 300w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/04\/SGC-Pic-6-April18-e1523898344902-768x332.jpg 768w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/04\/SGC-Pic-6-April18-e1523898344902-1024x443.jpg 1024w, https:\/\/sites.austincc.edu\/bond\/wp-content\/uploads\/sites\/7\/2018\/04\/SGC-Pic-6-April18-e1523898344902-150x65.jpg 150w\" sizes=\"auto, (max-width: 4032px) 100vw, 4032px\" \/><\/p>\n<p><span style=\"font-weight: 400\">Crews are finalizing installation throughout campus in April. The irrigation and landscape subcontractor also continues work at bio-retention ponds. The planting of trees continues and crews completed the installation of all three water collection tanks on site. A grand opening celebration is scheduled for the end of May.<\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Crews are finalizing installation throughout campus in April. The irrigation and landscape subcontractor also continues work at bio-retention ponds. The planting of trees continues and crews completed the installation of all three water collection tanks &hellip; <a href=\"https:\/\/sites.austincc.edu\/bond\/san-gabriel-campus-campus-installation-continues\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3556,"featured_media":1843,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9],"tags":[68,75,71,47],"class_list":["post-1841","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-leander-campus","tag-grand-opening","tag-installation","tag-progress","tag-san-gabriel-campus"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/users\/3556"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/comments?post=1841"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1841\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media\/1843"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media?parent=1841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/categories?post=1841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/tags?post=1841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}