{"id":1950,"date":"2018-09-27T18:40:23","date_gmt":"2018-09-27T18:40:23","guid":{"rendered":"https:\/\/sites.austincc.edu\/bond\/?p=1950"},"modified":"2019-12-17T19:02:54","modified_gmt":"2019-12-17T19:02:54","slug":"round-rock-campus-college-celebrates-grand-opening-of-phase-2","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/bond\/round-rock-campus-college-celebrates-grand-opening-of-phase-2\/","title":{"rendered":"September 2018 | Round Rock Campus Phase 2: Grand Opening"},"content":{"rendered":"<p>On Wednesday, September 26, 2018, ACC unveiled phase 2 of Round Rock Campus during a grand opening celebration.\u00a0The new building features the college&#8217;s third ACCelerator with approximately 140 computers, advanced classrooms, and state-of-the-art science labs as well as a social staircase where students can gather to relax or study.<\/p>\n<p>The expansion at Round Rock Campus also allows for continued growth of ACC&#8217;s health sciences programs. Renovations are currently underway to provide three new beds to the nursing and cardiac sonography\u00a0<span class=\"il\">simulation labs.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The event marks an important milestone for the college\u2019s capital improvement projects. It follows three other grand openings held this year for voter-approved 2014 bond projects: The Elgin Campus phase 2, with Veterinary Technology and Sustainable Agricultural Entrepreneur program facilities; the new San Gabriel Campus in Leander; and the Public Safety Training Center at Hays Campus, which offers the college\u2019s first regional law enforcement training center.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On Wednesday, September 26, 2018, ACC unveiled phase 2 of Round Rock Campus during a grand opening celebration.\u00a0The new building features the college&#8217;s third ACCelerator with approximately 140 computers, advanced classrooms, and state-of-the-art science labs &hellip; <a href=\"https:\/\/sites.austincc.edu\/bond\/round-rock-campus-college-celebrates-grand-opening-of-phase-2\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3556,"featured_media":1951,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[11],"tags":[68,70,21],"class_list":["post-1950","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-round-rock-campus","tag-grand-opening","tag-phase-2","tag-round-rock-campus"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1950","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/users\/3556"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/comments?post=1950"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/1950\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media\/1951"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media?parent=1950"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/categories?post=1950"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/tags?post=1950"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}