{"id":2018,"date":"2019-03-19T15:34:29","date_gmt":"2019-03-19T15:34:29","guid":{"rendered":"https:\/\/sites.austincc.edu\/bond\/?p=2018"},"modified":"2019-12-17T19:00:08","modified_gmt":"2019-12-17T19:00:08","slug":"highland-phase-2-framing-and-exterior-work","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/bond\/highland-phase-2-framing-and-exterior-work\/","title":{"rendered":"March 2019 | ACC Highland Phase 2"},"content":{"rendered":"<p><strong>At ACC Highland Phase 2<\/strong>, construction teams continue work on framing, steel erection, and\u00a0the exterior shell. Exterior window installation also continues, along with\u00a0mechanical, electrical, and plumbing work.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"media-element file-default\" src=\"https:\/\/www.austincc.edu\/sites\/default\/files\/12-18-2018%20aerial%20HLC2%20%281%29.jpg\" alt=\"\" width=\"353\" height=\"199\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"media-element file-default\" src=\"https:\/\/www.austincc.edu\/sites\/default\/files\/1-10-2019%20lounge%20by%20Games.jpg\" alt=\"\" width=\"317\" height=\"211\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"media-element file-default\" src=\"https:\/\/www.austincc.edu\/sites\/default\/files\/1-10-2019%20large%20opening%20HLC2%20%281%29.jpg\" alt=\"\" width=\"339\" height=\"226\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>At ACC Highland Phase 2, construction teams continue work on framing, steel erection, and\u00a0the exterior shell. Exterior window installation also continues, along with\u00a0mechanical, electrical, and plumbing work.<\/p>\n","protected":false},"author":3556,"featured_media":2019,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[8,1],"tags":[24,92,83,64,93,94],"class_list":["post-2018","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-highland-campus","category-updates","tag-acc-highland","tag-framing","tag-highland","tag-highland-phase-2","tag-steel","tag-windows"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/2018","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/users\/3556"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/comments?post=2018"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/2018\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media\/2019"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media?parent=2018"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/categories?post=2018"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/tags?post=2018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}