{"id":2182,"date":"2020-09-30T15:45:58","date_gmt":"2020-09-30T15:45:58","guid":{"rendered":"https:\/\/sites.austincc.edu\/bond\/?p=2182"},"modified":"2020-09-30T15:46:00","modified_gmt":"2020-09-30T15:46:00","slug":"september-2020-rio-grande-campus-renovations","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/bond\/september-2020-rio-grande-campus-renovations\/","title":{"rendered":"September 2020 | Rio Grande Campus Renovations"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Rio Grande Campus will be home to the new first-of-its-kind Army Futures Command Software Factory. The factory will take up a portion of two floors of the building and is expected to open in mid- to late-January 2021. The factory will not impact the renovation project timeline. Construction remains on track to be completed in spring 2021, and move-in will begin at the end of spring and continue through summer. Classes are expected to resume in fall 2021. Learn more&nbsp;<a href=\"https:\/\/www.austincc.edu\/news\/2020\/09\/army-futures-command-selects-austin-community-college-district-home-new-afc-software?ref=spotlight?ref=facstaffbanner\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rio Grande Campus will be home to the new first-of-its-kind Army Futures Command Software Factory. The factory will take up a portion of two floors of the building and is expected to open in mid- &hellip; <a href=\"https:\/\/sites.austincc.edu\/bond\/september-2020-rio-grande-campus-renovations\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":4176,"featured_media":2183,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10,1],"tags":[40,42,95,28],"class_list":["post-2182","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rio-grande-campus","category-updates","tag-renovation","tag-renovations","tag-rio-grande","tag-rio-grande-campus"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/2182","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/users\/4176"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/comments?post=2182"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/posts\/2182\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media\/2183"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/media?parent=2182"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/categories?post=2182"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/bond\/wp-json\/wp\/v2\/tags?post=2182"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}