Adaptive Reuse of Gymnasium Update

Site work continues this week, mostly excavation and debris removal.  Inside the shell, the elevator pit has been dug and the concrete floor and walls are poured.

The elevator pit is conventional construction.  The floor is a slab-on-grade and the walls were formed with plywood.

The elevator pit is conventional construction. The floor is a slab-on-grade and the walls were formed with plywood.

The new utility trench will connect the new central plant with the main campus.

The new utility trench will connect the new central plant with the main campus.

Most of the roof deck has been replaced.

Most of the roof deck has been replaced.