KLBJ AM: ACC’s Rio Grande Campus to be updated
The Austin Community College District celebrated the groundbreaking for renovations at its Rio Grande Campus today.
Scheduled to open in late 2019, plans feature:
• Expanded spaces for ACC’s Deaf and hard-of-hearing community.
• A three-level, 168-seat ACCelerator learning lab — integrated with a campus library and spaces for academic coaching and small group sessions.
• Two enclosed courtyards – one to serve as a commons area for studying and relaxing, and second suitable for group gatherings. Special roof material will permit natural, ambient light
• Six science labs.
• High-speed Internet network with building-wide wireless access.
• Park-like outdoor spaces.
Tags: groundbreaking, KLBJ AM, rio grande campus
Back to Top