{"id":44600,"date":"2017-10-10T17:04:49","date_gmt":"2017-10-10T17:04:49","guid":{"rendered":"https:\/\/sites.austincc.edu\/newsroom\/?p=44600"},"modified":"2017-10-10T19:30:54","modified_gmt":"2017-10-10T19:30:54","slug":"celebrating-progress-rrc-topping-out-celebration-marks-construction-milestone","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/newsroom\/2017\/10\/10\/celebrating-progress-rrc-topping-out-celebration-marks-construction-milestone\/","title":{"rendered":"Celebrating progress: RRC topping out celebration marks construction milestone"},"content":{"rendered":"<p><span style=\"font-weight: 400\">ACC and its construction partners celebrated progress at Round Rock Campus Phase 2 with a topping out celebration Friday, September 15, 2017. \u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Construction crews, crafts workers, architects, engineers, and others on the project team gathered to sign a steel beam that will be placed in a stairwell of the new building.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cWe are celebrating teamwork today,\u201d says Tyler Carpenter, Senior Project Manager at SpawGlass.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cIt takes great collaboration to bring projects like this expansion forward,\u201d says Dr. Richard Rhodes, ACC president\/CEO. <\/span><span style=\"font-weight: 400\">\u201cThere is no more critical time for us to invest in our workforce, and Phase 2 will do that.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400\">Phase 2 will add a 45,000 square-foot general education building and renovate existing facilities to support a number of programs, particularly those for high-demand healthcare careers such as nursing, sonography, and surgical technology. Campus capacity will increase from 5,000 to 6,000 students. <\/span><\/p>\n<p><span style=\"font-weight: 400\">The new building will also include a second<\/span><a href=\"http:\/\/www.austincc.edu\/highland-campus\/accelerator\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400\">ACCelerator<\/span><\/a><span style=\"font-weight: 400\">.<\/span> <span style=\"font-weight: 400\">The innovative computer lab will feature more than 140 computer stations for individualized learning.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cThe facilities are great, especially having the opportunity to study here and not drive all the way into Austin. This campus is accessible and provides a great learning experience,\u201d says Luis Quijano, student.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Luis Quijano, Round Rock native, is a sophomore at ACC\u2019s Round Rock campus studying<\/span><a href=\"http:\/\/www.austincc.edu\/degrees-and-certificates\/areas-of-study\/health-sciences\/pre-med\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400\">Pre-Med<\/span><\/a><span style=\"font-weight: 400\">. He also serves as secretary for student government.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cFellow students tell me they feel the new building is a welcome change. They are really happy it is coming up, and even if they are unable to experience it, they are happy that others will,\u201d Quijano concludes.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Phase 2 is expected to open in 2018.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Follow its progress and other capital improvement proje<\/span><span style=\"font-weight: 400\">cts on the <\/span><a href=\"https:\/\/sites.austincc.edu\/bond\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400\">ACC Bond Projects website<\/span><\/a><span style=\"font-weight: 400\">.<\/span><\/p>\n<div class=\"embed-responsive  embed-responsive-16by9\">\n<div class=\"iframe-container\">\n<div class=\"iframe-container\"><iframe loading=\"lazy\" class=\"embed-responsive-item\"   class=\"embed-responsive-item\"   title=\"Topping Out Round Rock Campus Phase 2\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/vxgLTha4tco?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/div>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p><a data-flickr-embed=\"true\" href=\"https:\/\/www.flickr.com\/photos\/accdistrict\/albums\/72157686814181074\" title=\"Round Rock Campus Topping Out by Austin Community College, on Flickr\" target=\"_blank\" rel=\"noopener\"><img src='https:\/\/live.staticflickr.com\/4439\/36490820733_bb192d5840.jpg' width='800' height='600' alt='RRC Topping Out'><\/a><script async src='https:\/\/embedr.flickr.com\/assets\/client-code.js' charset='utf-8'><\/script><\/p>\n<div style=\"width: 1000px;overflow: hidden\">\n<p>&nbsp;<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>ACC and its construction partners celebrated progress at Round Rock Campus Phase 2 with a topping out celebration Friday, September 15, 2017. \u00a0 Construction crews, crafts workers, architects, engineers, and others on the project team &hellip; <a href=\"https:\/\/sites.austincc.edu\/newsroom\/2017\/10\/10\/celebrating-progress-rrc-topping-out-celebration-marks-construction-milestone\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":4107,"featured_media":44622,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15,1],"tags":[1733,271,99,1569],"class_list":["post-44600","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-facstaff-news","category-updates","tag-bond-update","tag-construction","tag-round-rock","tag-topping-out"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/44600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/users\/4107"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/comments?post=44600"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/44600\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/media\/44622"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/media?parent=44600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/categories?post=44600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/tags?post=44600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}