{"id":44628,"date":"2017-10-10T20:08:55","date_gmt":"2017-10-10T20:08:55","guid":{"rendered":"https:\/\/sites.austincc.edu\/newsroom\/?p=44628"},"modified":"2018-08-09T21:25:00","modified_gmt":"2018-08-09T21:25:00","slug":"bond-projects-update-construction-begins-at-highland-san-gabriel-crews-begin-installing-drywall-round-rock-tops-out","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/newsroom\/2017\/10\/10\/bond-projects-update-construction-begins-at-highland-san-gabriel-crews-begin-installing-drywall-round-rock-tops-out\/","title":{"rendered":"Bond projects update: Construction begins at Highland; San Gabriel crews begin installing drywall; Round Rock tops out"},"content":{"rendered":"<p><span style=\"font-weight: 400\">Work is progressing on voter-approved bond projects districtwide. Read summaries below and stay-up-to-date on each project through the <\/span><a href=\"https:\/\/sites.austincc.edu\/bond\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400\">ACC Bond Construction Projects website<\/span><\/a><span style=\"font-weight: 400\">. <\/span><\/p>\n<p><b>Highland Phase 2: Construction begins<\/b><\/p>\n<p><span style=\"font-weight: 400\">Construction is set to begin on ACC Highland Phase 2 that will add advanced facilities to prepare students for high-demand careers and nurture local business growth. Community leaders and friends joined ACC September 21 for a ceremonial groundbreaking. The project remains on target for completion in spring\/summer 2020 with classes beginning fall 2020. <a href=\"https:\/\/www.flickr.com\/photos\/accdistrict\/albums\/72157685421807532\" target=\"_blank\" rel=\"noopener\">See photos from the event.<\/a>\u00a0<a href=\"https:\/\/sites.austincc.edu\/newsroom\/groundbreaking-marks-beginning-of-highland-phase-2\/\" target=\"_blank\" rel=\"noopener\">More information here<\/a>.\u00a0<\/span><\/p>\n<p><b>San Gabriel: Structural progression<\/b><\/p>\n<p><span style=\"font-weight: 400\">Construction crews continue work on the structural steel erection of the west and east canopies. In addition, above ceiling work, including the installation of fire sprinkler pipes, plumbing lines, and chilled water piping, continued at all three levels of the building.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Crews began installation of drywall and insulation on the third floor and work progressed on the parking lot. <\/span><\/p>\n<p><span style=\"font-weight: 400\">A live webcam on the <\/span><a href=\"https:\/\/sites.austincc.edu\/bond\/leander-campus-updates\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400\">ACC Bond Projects: San Gabriel Campus<\/span><\/a><span style=\"font-weight: 400\"> webpage shows the campus taking shape in real time.<\/span><\/p>\n<p><b>Round Rock Phase 2: Framework completed<\/b><\/p>\n<p><span style=\"font-weight: 400\">ACC and its construction partners celebrated progress at Round Rock Campus Phase 2 with a topping out celebration Friday, September 15. Construction crews, crafts workers, architects, engineers, and others on the project team gathered to sign a steel beam that will be placed in a stairwell of the new building. Phase 2 is expected to open in 2018. <a href=\"https:\/\/www.flickr.com\/photos\/accdistrict\/albums\/72157686814181074\" target=\"_blank\" rel=\"noopener\">See photos from the event<\/a> and a <a href=\"https:\/\/www.youtube.com\/watch?v=vxgLTha4tco\" target=\"_blank\" rel=\"noopener\">brief video<\/a>. <a href=\"https:\/\/sites.austincc.edu\/newsroom\/celebrating-progress-rrc-topping-out-celebration-marks-construction-milestone\/\" target=\"_blank\" rel=\"noopener\">More information here<\/a>.\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work is progressing on voter-approved bond projects districtwide. Read summaries below and stay-up-to-date on each project through the ACC Bond Construction Projects website. Highland Phase 2: Construction begins Construction is set to begin on ACC &hellip; <a href=\"https:\/\/sites.austincc.edu\/newsroom\/2017\/10\/10\/bond-projects-update-construction-begins-at-highland-san-gabriel-crews-begin-installing-drywall-round-rock-tops-out\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":4107,"featured_media":44629,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15],"tags":[32,1748,1747,775,71,1522,424,1746,874,1569],"class_list":["post-44628","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-facstaff-news","tag-bond","tag-bond-project-update","tag-construction-update","tag-groundbreaking","tag-highland-campus","tag-highland-phase-2","tag-round-rock-campus","tag-round-rock-phase-2","tag-san-gabriel-campus","tag-topping-out"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/44628","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/users\/4107"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/comments?post=44628"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/44628\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/media\/44629"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/media?parent=44628"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/categories?post=44628"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/tags?post=44628"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}