{"id":49686,"date":"2019-06-13T16:02:00","date_gmt":"2019-06-13T21:02:00","guid":{"rendered":"https:\/\/sites.austincc.edu\/newsroom\/?p=49686"},"modified":"2024-12-06T13:58:13","modified_gmt":"2024-12-06T18:58:13","slug":"rio-grande-renovations-continue-at-steady-pace","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/newsroom\/2019\/06\/13\/rio-grande-renovations-continue-at-steady-pace\/","title":{"rendered":"Rio Grande renovations continue at steady pace"},"content":{"rendered":"<p>Construction crews continue to make progress on the Rio Grande Campus renovations. In May, shoring \u2014 the process of temporarily supporting a building with props during alterations \u2014 was completed at the south mechanical room and the elevated slab poured. Slab was also poured at the south multipurpose room. In the center area, the columns and beams from levels 0 to 3 were demolished. Plumbing pipes have been installed underground at the bottom level.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"497\" height=\"444\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/11\/center-area-demo.gif\" alt=\"demolition of center area of Rio Grande Campus\" class=\"wp-image-49687\" style=\"width:400px\" \/><\/figure>\n<\/div>\n<p>In June, new slab will be poured at level 1 north entry and around the north and south chase. Crews will also start steel framing and metal decking at level 2 east entry and do the formwork for the slab in the ACCelerator room.<\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"495\" height=\"438\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2019\/06\/rgc_south-multipurpose-slab.gif\" alt=\"\" class=\"wp-image-51383\" style=\"width:400px\" \/><\/figure>\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"497\" height=\"438\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2019\/06\/rgc_basement-trench.gif\" alt=\"\" class=\"wp-image-51382\" style=\"width:400px\" \/><\/figure>\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"497\" height=\"440\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/11\/west-chase-openings.gif\" alt=\"\" class=\"wp-image-49688\" style=\"width:400px\" \/><\/figure>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Construction crews continue to make progress on the Rio Grande Campus renovations. In May, shoring \u2014 the process of temporarily supporting a building with props during alterations \u2014 was completed at the south mechanical room &hellip; <a href=\"https:\/\/sites.austincc.edu\/newsroom\/2019\/06\/13\/rio-grande-renovations-continue-at-steady-pace\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3930,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12,11,13,15,17],"tags":[271,1747,1449],"class_list":["post-49686","post","type-post","status-publish","format-standard","hentry","category-business-and-community","category-campus-updates","category-current-students","category-facstaff-news","category-news-and-announcements","tag-construction","tag-construction-update","tag-rio-grande-campus-renovation"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/49686","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/users\/3930"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/comments?post=49686"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/49686\/revisions"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/media?parent=49686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/categories?post=49686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/tags?post=49686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}