{"id":50613,"date":"2020-07-17T14:20:00","date_gmt":"2020-07-17T19:20:00","guid":{"rendered":"https:\/\/sites.austincc.edu\/newsroom\/?p=50613"},"modified":"2024-12-02T16:56:52","modified_gmt":"2024-12-02T21:56:52","slug":"new-acc-highland-signage-now-up-on-south-parking-garage","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/newsroom\/2020\/07\/17\/new-acc-highland-signage-now-up-on-south-parking-garage\/","title":{"rendered":"New ACC Highland signage now up on south parking garage"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"500\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/11\/HLCGarageLettersInstallation1.jpg\" alt=\"Crews assist with ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage, on Wednesday, July 15, 2020.\" class=\"wp-image-50614\" style=\"width:794px;height:auto\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/11\/HLCGarageLettersInstallation1.jpg 750w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/11\/HLCGarageLettersInstallation1-300x200.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/11\/HLCGarageLettersInstallation1-150x100.jpg 150w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption class=\"wp-element-caption\">ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage.<\/figcaption><\/figure>\n<\/div>\n<p>Construction on Austin Community College District&#8217;s (ACC) Highland Campus reached another milestone this week.<\/p>\n<p>On Wednesday, July 15, ACC\u2019s Facilities and Construction team and project crews added the college&#8217;s name to the external-facing wall of the new Highland Campus South Parking Garage.<\/p>\n<p>The letters spell out ACC Highland on the seventh level of the southeast end of the garage. Each letter is about&nbsp;eight feet tall and will look Riverbat purple during the day. At night the letters will light up white. The electrical is expected to be connected over the next week.<\/p>\n<p>It took more than eight hours to raise the letters from flatbed trailers with a crane. They were securely bolted to the building on July 16.<\/p>\n<p>The parking garage serves as the branding for Highland Campus, visible to people on Interstate 35, Highway 290, and areas to the east and southeast of the campus.<\/p>\n<p>A virtual event to celebrate the many Highland project milestones is being planned.<\/p>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"500\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation21.jpg\" alt=\"\" class=\"wp-image-51187\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation21.jpg 750w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation21-300x200.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation21-150x100.jpg 150w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption class=\"wp-element-caption\">ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage, on Wednesday, July 15, 2020.<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"500\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation22.jpg\" alt=\"\" class=\"wp-image-51192\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation22.jpg 750w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation22-300x200.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation22-150x100.jpg 150w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption class=\"wp-element-caption\">ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage, on Wednesday, July 15, 2020.<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"500\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation23.jpg\" alt=\"\" class=\"wp-image-51190\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation23.jpg 750w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation23-300x200.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation23-150x100.jpg 150w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption class=\"wp-element-caption\">ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage, on Wednesday, July 15, 2020.<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"500\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation24.jpg\" alt=\"\" class=\"wp-image-51189\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation24.jpg 750w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation24-300x200.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2020\/07\/hlcgaragelettersinstallation24-150x100.jpg 150w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption class=\"wp-element-caption\">ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage, on Wednesday, July 15, 2020.<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"500\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation25-3.jpg\" alt=\"\" class=\"wp-image-51182\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation25-3.jpg 750w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation25-3-300x200.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation25-3-150x100.jpg 150w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption class=\"wp-element-caption\">ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage, on Wednesday, July 15, 2020.<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"500\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation26-2.jpg\" alt=\"\" class=\"wp-image-51178\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation26-2.jpg 750w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation26-2-300x200.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation26-2-150x100.jpg 150w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption class=\"wp-element-caption\">ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage, on Wednesday, July 15, 2020.<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"500\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation27-3.jpg\" alt=\"\" class=\"wp-image-51185\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation27-3.jpg 750w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation27-3-300x200.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation27-3-150x100.jpg 150w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption class=\"wp-element-caption\">ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage, on Wednesday, July 15, 2020.<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"500\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation28-3.jpg\" alt=\"\" class=\"wp-image-51184\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation28-3.jpg 750w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation28-3-300x200.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation28-3-150x100.jpg 150w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption class=\"wp-element-caption\">ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage, on Wednesday, July 15, 2020.<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"500\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation29-3.jpg\" alt=\"\" class=\"wp-image-51183\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation29-3.jpg 750w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation29-3-300x200.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2024\/12\/hlcgaragelettersinstallation29-3-150x100.jpg 150w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption class=\"wp-element-caption\">ACC HIGHLAND letters installation on the East facing side of the Highland Campus parking garage, on Wednesday, July 15, 2020.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Construction on Austin Community College District&#8217;s (ACC) Highland Campus reached another milestone this week. On Wednesday, July 15, ACC\u2019s Facilities and Construction team and project crews added the college&#8217;s name to the external-facing wall of &hellip; <a href=\"https:\/\/sites.austincc.edu\/newsroom\/2020\/07\/17\/new-acc-highland-signage-now-up-on-south-parking-garage\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3930,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12,11,13,15,17],"tags":[143,271,1747,1522,3975,3974],"class_list":["post-50613","post","type-post","status-publish","format-standard","hentry","category-business-and-community","category-campus-updates","category-current-students","category-facstaff-news","category-news-and-announcements","tag-acc-highland","tag-construction","tag-construction-update","tag-highland-phase-2","tag-parking-garage","tag-signage"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/50613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/users\/3930"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/comments?post=50613"}],"version-history":[{"count":0,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/50613\/revisions"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/media?parent=50613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/categories?post=50613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/tags?post=50613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}