{"id":53268,"date":"2026-08-03T10:56:46","date_gmt":"2026-08-03T15:56:46","guid":{"rendered":"https:\/\/sites.austincc.edu\/newsroom\/?p=53268"},"modified":"2026-08-03T10:56:47","modified_gmt":"2026-08-03T15:56:47","slug":"hays-campus-expansion-project-moves-closer-to-construction","status":"publish","type":"post","link":"https:\/\/sites.austincc.edu\/newsroom\/2026\/08\/03\/hays-campus-expansion-project-moves-closer-to-construction\/","title":{"rendered":"Hays Campus Expansion Project Moves Closer to Construction"},"content":{"rendered":"<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2026\/08\/Interior-Renderings-1024x576.jpg\" alt=\"\" class=\"wp-image-53269\" srcset=\"https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2026\/08\/Interior-Renderings-1024x576.jpg 1024w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2026\/08\/Interior-Renderings-300x169.jpg 300w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2026\/08\/Interior-Renderings-768x432.jpg 768w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2026\/08\/Interior-Renderings-150x84.jpg 150w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2026\/08\/Interior-Renderings-320x180.jpg 320w, https:\/\/sites.austincc.edu\/newsroom\/wp-content\/uploads\/sites\/81\/2026\/08\/Interior-Renderings.jpg 1152w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<p class=\"wp-block-paragraph\">Austin Community College District (ACC) continues to make progress on the Hays Campus healthcare programs expansion. The architect design team recently extended the overall design schedule to fully integrate cost-saving measures without compromising the facility&#8217;s quality or long-term functionality.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">The final drawings are expected by the end of August. Once complete, the general contractor will begin the first round of subcontractor bid solicitations.<\/p>\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2026\/08\/Interior-Renderings-4-1024x576.jpg\" alt=\"\" class=\"wp-image-52566\" \/><\/figure>\n<\/div>\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2026\/08\/Interior-Renderings-5-1024x576.jpg\" alt=\"\" class=\"wp-image-52567\" \/><\/figure>\n<\/div>\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/students.austincc.edu\/infohub\/wp-content\/uploads\/sites\/35\/2026\/08\/Interior-Renderings-2-1024x576.jpg\" alt=\"\" class=\"wp-image-52568\" \/><\/figure>\n<\/div>\n<\/div>\n<h3 class=\"wp-block-heading\">Collaborative Planning Continues<\/h3>\n<p class=\"wp-block-paragraph\">The project team continues to meet with individual College departments to refine space allocations and confirm equipment requirements. These collaborative planning sessions make sure instructional, laboratory, and support spaces meet the needs of future students, faculty, and staff.<\/p>\n<h3 class=\"wp-block-heading\">Commitment to Sustainable Design<\/h3>\n<p class=\"wp-block-paragraph\">Sustainability remains a central focus throughout the project. Work continues to advance key LEED green building initiatives that support energy efficiency, responsible resource use, and long-term environmental performance. LEED, or Leadership in Energy and Environmental Design, is the rating system used by the U.S. Green Building Council to measure a building\u2019s sustainability and resource-efficiency.<\/p>\n<h3 class=\"wp-block-heading\">Looking Ahead<\/h3>\n<p class=\"wp-block-paragraph\">The Hays Campus expansion remains on schedule to open for the fall 2028 semester. Funded through the 2022 General Obligation Bond, the project will expand capacity for high-demand healthcare programs and help meet the growing educational and workforce needs of the Hays County region.<\/p>\n<p class=\"wp-block-paragraph\">A groundbreaking ceremony is planned for September 2026.<\/p>\n<p class=\"wp-block-paragraph\">For updates on this and other bond projects, visit <a href=\"http:\/\/austincc.edu\/bond\" target=\"_blank\" rel=\"noopener\">austincc.edu\/bond<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Austin Community College District (ACC) continues to make progress on the Hays Campus healthcare programs expansion. The architect design team recently extended the overall design schedule to fully integrate cost-saving measures without compromising the facility&#8217;s &hellip; <a href=\"https:\/\/sites.austincc.edu\/newsroom\/2026\/08\/03\/hays-campus-expansion-project-moves-closer-to-construction\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3930,"featured_media":53269,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[17,12,15,19],"tags":[2113,32,332,743,434],"class_list":["post-53268","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-announcements","category-business-and-community","category-facstaff-news","category-students-and-alumni","tag-2022-go-bond","tag-bond","tag-hays-campus","tag-health-sciences","tag-nursing"],"acf":[],"_links":{"self":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/53268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/users\/3930"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/comments?post=53268"}],"version-history":[{"count":1,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/53268\/revisions"}],"predecessor-version":[{"id":53270,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/posts\/53268\/revisions\/53270"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/media\/53269"}],"wp:attachment":[{"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/media?parent=53268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/categories?post=53268"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.austincc.edu\/newsroom\/wp-json\/wp\/v2\/tags?post=53268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}