September 2020 | ACC Highland Phase 2

The Black Box Theatre wood floor is being installed. The wood stage flooring in the Music Performance Hall will be installed soon. The fixed seating in the performance spaces is being installed. Final touches and last-minute finishes are being completed. The mechanical and electrical systems have had a final inspection. The plumbing and fire alarm systems are being tested and will be inspected soon. The majority of the furniture has been installed and equipment installation is well underway. The exterior furniture has been installed as well.

Tags: , , , ,

Back to Top